Hyperscale · Colocation · Built-to-Suit

Cyberjaya data centre sites and infrastructure

Evaluate land, powered shells and built-to-suit projects near established operators. Start with the IT load and energisation schedule your project needs.

Illustrative view of a data centre campus and its mechanical plantIllustrative image

Operator ecosystem

Established operators in Cyberjaya

NTT DATA’s Cyberjaya facilities include CBJ4, CBJ5 and CBJ6. AIMS operates a Cyberjaya facility and Telekom Malaysia has developed its Klang Valley Data Centre campus here. The AWS Asia Pacific (Malaysia) Region is part of the wider national cloud ecosystem.

Land and powered shells

Screen parcels and existing structures against your utility, planning, structural and expansion criteria. Establish who delivers the substation, duct routes and plant infrastructure, and who bears the cost if delivery dates slip.

Built-to-suit projects

Specify the initial and full-build IT load, rack density, mechanical and electrical requirements, commissioning milestones and contractual delivery tests before comparing proposals.

Colocation

Compare available capacity, deployment dates, carrier access and service terms. Ask for evidence of Tier certification and its scope, including whether it applies to the facility or its design documents.

Site due diligence

What to verify before shortlisting a parcel

  • Power. Confirm contracted grid capacity, feeder independence and target energisation dates with the utility. Allow for the difference between IT load and total facility demand.
  • Fibre. Ask providers for route diagrams and identify shared ducts, crossings and entry points. Availability and diversity depend on the plot.
  • Cooling and water. Check water availability, discharge requirements, heat rejection design and water-use targets against your operating model.
  • Land and permitting. Check title, zoning, setbacks, access, expansion area, drainage and site-specific geotechnical and flood conditions. Review the approval sequence against the delivery schedule.

Share your power and delivery requirements

Include your initial and ultimate IT load, site size, redundancy requirements and target energisation date.

Discuss a data centre requirement